The short answer

How much does a home renovation cost in Dubai?

A full residential renovation in Dubai typically costs AED 260–700 per sq ft for apartments and AED 320–1,400 per sq ft for villas, depending on finish level and whether the layout changes. A 3-bedroom villa refurbishment usually lands between AED 450,000 and AED 1.4 million and takes 12–20 weeks on site once approvals clear.

Four variables move the number more than anything else:

  • Structural change — moving walls, adding a staircase or an extension requires engineering drawings and authority approval.
  • MEP condition — villas built before 2015 in Springs, Meadows or Jumeirah often need complete plumbing and electrical replacement.
  • Joinery and stone — bespoke kitchens, wardrobes and slab-matched marble are the single largest line in most BOQs.
  • Community rules — Emaar, Nakheel, Trakhees and Dubai Municipality each set their own NOC requirements, deposits and working hours.
Reviewed by Haifa Renov8 technical teamUpdated 12 August 2026Indicative ranges, not quotations

The transformation

Drag the line. That's the same room.

Renovation is judged on one thing: the distance between what a space was and what it became. Pick a project and pull the handle.

After Renovation
Before
BEFORE
AFTER HAIFA RENOV

Green Lakes S1 · Master bedroom

Full interior fit-out · 14 weeks

Demo pairing assembled from the Haifa archive. Replace each pair with matched as-found and delivered frames of the same room, shot from the same position, before launch.

After Renovation
Before
BEFORE
AFTER HAIFA RENOV

Springs 6 · Guest bedroom

Villa renovation · Emaar community

Demo pairing assembled from the Haifa archive. Replace each pair with matched as-found and delivered frames of the same room, shot from the same position, before launch.

After Renovation
Before
BEFORE
AFTER HAIFA RENOV

Palmera 01, Arabian Ranches · Living

Layout reconfiguration · 18 weeks

Demo pairing assembled from the Haifa archive. Replace each pair with matched as-found and delivered frames of the same room, shot from the same position, before launch.

After Renovation
Before
BEFORE
AFTER HAIFA RENOV

Silver Springs, Damac · Living & pool

Renovation with pool integration

Demo pairing assembled from the Haifa archive. Replace each pair with matched as-found and delivered frames of the same room, shot from the same position, before launch.

What we renovate

Six scopes, one contract, no handoffs

Every scope below is designed, engineered, approved and built by Haifa Renov8 teams. Nothing is passed to a third-party main contractor.

Whole property
villa renovation

Villa renovation

Full-house refurbishment for Emaar, Nakheel, Damac and Meraas villas — layout reconfiguration, MEP replacement, façade works, staircases and extensions.

  • Structural drawings and NOC handling
  • Built-up-area and extension applications
  • Complete MEP first and second fix
Whole property
apartment renovation

Apartment renovation

High-rise remodelling with building-management coordination, protected access routes and works sequenced around your neighbours.

  • Owners association and fit-out NOCs
  • Waterproofing and acoustic upgrades
  • Service-lift booking and debris management
Room-led
kitchen & bathroom remodelling

Kitchen & bathroom remodelling

Wet areas done properly: slab removal, re-screeding, tanking and new drainage falls before a single cabinet arrives on site.

  • Joinery from our own workshop
  • Full tanking with extended warranty
  • Stone and appliance procurement
Interior
Residential interior fit-out

Residential interior fit-out

Design development, FF&E, lighting design and joinery for owners who want the interior resolved as one composition rather than a series of purchases.

  • Lighting and switching layouts
  • Wardrobe and media joinery
  • Material boards and mock-ups
Exterior
Swimming pools & jacuzzis

Swimming pools & jacuzzis

Structural shell, filtration, heating and finishes engineered as part of the house — not bolted on afterwards by a separate pool company.

  • Skimmer, overflow and infinity designs
  • Plant room and equipment sizing
  • Pool NOC and safety compliance
Exterior
Landscaping & outdoor living

Landscaping & outdoor living

Hardscape, irrigation, planting, pergolas and outdoor kitchens designed to survive a Dubai summer, not just photograph well in November.

  • Drainage and irrigation engineering
  • Pergolas, gazebos, BBQ counters
  • Outdoor lighting and power

Delivered work

Recent residential projects

Budget

Residential renovation cost in Dubai, by property and finish

All-in construction ranges including labour, materials, supervision and standard authority submissions. Loose furniture, artwork and appliances are excluded unless specified.

Indicative build rates · AED per sq ft · Dubai · 2026
Property type Standard Premium Bespoke Typical duration
Apartment (1-2 BR) 260 - 380 380 - 640 640 - 1,000 6 - 12 weeks
Apartment (3 BR+ / penthouse) 300 - 430 430 - 720 720 - 1,150 10 - 18 weeks
Townhouse 300 - 460 460 - 760 760 - 1,200 10 - 16 weeks
Villa (3-4 BR) 320 - 500 500 - 820 820 - 1,400 12 - 20 weeks
Villa (5 BR+ / mansion) 380 - 560 560 - 900 900 - 1,600 18 - 34 weeks

Estimate your renovation in 30 seconds

No email required. The range updates as you choose.

Property type
Built-up area
6,100 SQ FT
Finish level
Additional scope
Indicative project range
AED 2.32M - AED 3.90M

6,100 sq ft apartment at AED 380-640/sq ft, premium finish.

Construction & finishes

AED 2.81M - AED 4.64M

Get a line-by-line BOQ

Planning tool only. Final pricing follows a site survey and measured BOQ.

Indicative project range
AED 2.81M - AED 4.64M

6,100 sq ft townhouse at AED 460-760/sq ft, premium finish.

Construction & finishes

AED 2.81M - AED 4.64M

Get a line-by-line BOQ

Planning tool only. Final pricing follows a site survey and measured BOQ.

Indicative project range
AED 3.05M - AED 5.00M

6,100 sq ft villa at AED 500-820/sq ft, premium finish.

Construction & finishes

AED 3.05M - AED 5.00M

Get a line-by-line BOQ

Planning tool only. Final pricing follows a site survey and measured BOQ.

Indicative project range
AED 3.42M - AED 5.49M

6,100 sq ft 5 BR+ villa at AED 560-900/sq ft, premium finish.

Construction & finishes

AED 3.42M - AED 3.42M

Get a line-by-line BOQ

Planning tool only. Final pricing follows a site survey and measured BOQ.

Approvals

Who has to approve your renovation

Most delays on Dubai residential projects are approval delays, not build delays. We submit under our own consultancy and contracting licences, so the drawings, the NOC and the site team answer to one programme.

Yes. Almost any work beyond painting and loose furniture needs a No Objection Certificate from your master developer and a building or modification permit from Dubai Municipality or the relevant authority. Structural changes, extensions, pools and façade alterations always require approved drawings from a licensed consultant.

We prepare the submission set, pay fees on your behalf against a transparent schedule, and track the application to release. Approval windows typically run four to eight weeks depending on community and scope.

Emaar reviews external alterations tightly: façade colour, boundary walls, pergolas, extensions and pool positions must match community guidelines. Contractor registration, a refundable security deposit and defined working hours are standard. Internal works still need an NOC but move faster.

Haifa Renov8 is a registered contractor across Emaar communities and prepares submissions to their drawing standards first time.

Nakheel requires its own NOC, contractor registration and deposit, with additional scrutiny on Palm Jumeirah for structural and marine-adjacent works. Waterproofing details and drainage connections are reviewed carefully because of the water table.

Trakhees regulates a number of Dubai's master communities under its own EHS and building code. Permits require licensed consultant drawings, a registered contractor and site safety documentation, with inspections at defined stages — so the construction programme has to be sequenced around them.

Apartment works need a fit-out NOC from the owners association or building management, plus agreed working hours, protected access routes, service-lift bookings and debris schedules. Wet-area alterations usually require a waterproofing method statement and a leak test before tiling.

How a project runs

Five stages, each with a document you receive

The sequence is fixed. What changes is duration, not order — which is why we commit to milestone dates instead of promises.

Stage 01

Site survey

Measured survey, condition report on MEP and structure, and a written scope brief you sign off.

Week 0-1
Stage 02

Design & BOQ

Concept, layouts, material boards and a line-by-line bill of quantities. No lump-sum mysteries.

Week 1-3
Stage 03

Approvals

Developer NOC, municipality permit, contractor registration and deposits, submitted and tracked by us.

Week 3-9
Stage 04

Construction

Dedicated site engineer, weekly photo report, milestone payments tied to verified progress.

Week 9+
Stage 05

Snagging & warranty

Joint snag list, testing and commissioning, O&M documents and a 12-month workmanship warranty.

Handover

Experience · Expertise · Authority · Trust

Why owners hand us the whole villa

Haifa Renov8 is part of Haifa Construction Group, operating in the UAE since 1992 and previously trading as Haifa Technical Services LLC.

Experience

1,350+ projects, 43 communities

Villas in Dubai Hills, Arabian Ranches, Palm Jumeirah, Al Barari and Emirates Hills; apartments in Downtown, Marina and JBR. Our case studies name the community, the scope and the programme.

Expertise

Architects and engineers on staff

Design is produced by the people who will be held to building it. Every drawing is vetted for buildability, code compliance and authority requirements before it reaches you.

Authoritativeness

Licensed, registered, insured

  • Dubai Municipality contracting licence
  • Registered with Emaar, Nakheel and Trakhees
  • Contractor all-risk and third-party cover
  • Documented quality and HSE procedures
Trust

Transparent money

  • Measured BOQ, every variation logged and priced
  • Milestone payments against verified progress
  • Weekly written and photographic reporting
  • 4.9-star verified Google rating
image

Case study · Sidra 1, Dubai Hills Estate

A 4-bedroom Sidra villa opened up for a family of five

The ground floor was compartmented, the maid's room blocked the kitchen's natural light, and the garden had no usable shade. We removed two non-structural partitions, relocated the kitchen to the garden elevation with a steel lintel design approved by Emaar, rebuilt every wet area, and added a shaded outdoor kitchen with a plunge pool.

The programme ran through a Dubai summer, so joinery was fabricated in our own workshop while site works continued — protecting the handover date.

4,100

Sq ft built-up

16 wks

On site, on programme

2

Structural openings approved

0

Unpriced variations

HR

Reviewed by the Haifa Renov8 technical team

Cost ranges, approval timelines and community requirements on this page are maintained by our senior project managers and design leads, and reviewed each quarter against live project data.

Last reviewed 12 August 2026 · Office No. F-58, The Curve Building, Sheikh Zayed Road, Dubai

Verified reviews

4.9 on Google, from Dubai homeowners

Where we work

Villa renovation by community

Every community has its own approval route, working hours and design guidelines. Pick yours for the specifics.

FAQs

Residential renovation questions, answered directly

A full 3–4 bedroom villa renovation takes 12 to 20 weeks on site, plus 4 to 8 weeks beforehand for design and approvals. Cosmetic refurbishments finish in 6 to 8 weeks. Extensions and structural work add 6 to 12 weeks because of engineering review and staged inspections.

For single-room or cosmetic work, yes — we phase the programme and seal the work zone. For a full renovation involving MEP replacement, water shut-offs and dust-generating demolition, we recommend vacating. Living on site typically extends the programme by 20–35% because working hours and access shrink.

Payments are milestone-based and tied to verified progress, not to the calendar. A typical structure is an advance on mobilisation, then staged releases at demolition complete, MEP first fix, finishes commencement and practical completion, with a retention released after the snagging period.

Renovation restores and upgrades what already exists — new finishes, new services, same layout. Remodelling changes the layout itself: removing walls, relocating kitchens and bathrooms, adding rooms. Remodelling needs structural drawings and authority approval; most renovation does not.

Yes. Every project carries a 12-month workmanship warranty on the works we execute, with manufacturer warranties passed through on equipment and specialist systems. Waterproofing to wet areas and pools carries its own extended warranty.

Kitchens, bathrooms, flooring and outdoor living deliver the strongest returns in Dubai's resale market, particularly in established communities where original 2005–2015 finishes now feel dated. Structural extensions add value only where the built-up area is formally approved and recorded — unapproved additions can reduce saleability.

Start a project

Tell us the property. We'll come and measure it.

A senior team member visits, surveys the space and returns a scoped budget band — before any commitment.

image

What happens next

  • We call within one business day to confirm scope and access.
  • Free site visit with a project manager and designer.
  • Measured budget band within 3–5 working days.
  • Full BOQ and drawings once you're ready to proceed.

+971 50 847 9303 · info@haifagroups.com
Office F-58, The Curve Building, Sheikh Zayed Road

Prototype only — connect this form to your CRM endpoint before publishing.