0
Commercial delivery in the UAE
0
In-house trades & engineers
0
Out-of-hours works available
0
Workmanship warranty

The short answer

How much does a commercial fit-out cost in Dubai?

Commercial fit-out in Dubai typically costs AED 180–280 per sq ft for Cat A office, AED 280–550 for a full Cat B office fit-out, AED 350–750 for retail and AED 450–1,100 for restaurants, where kitchen extraction and civil defence requirements drive the cost. Most projects run 6–16 weeks on site once permits clear.

What separates a commercial budget from a residential one:

  • Authority route — DDA, Trakhees, DMCC, DAFZA, DSO and Dubai Municipality each have different submission sets and inspection stages.
  • MEP density — HVAC rebalancing, fire alarm modification and data infrastructure are usually 30–45% of the total.
  • Landlord conditions — fit-out guides, working hours, insurance levels and reinstatement obligations.
  • Business continuity — phased handovers and night works cost more per hour but protect trading revenue.
Reviewed by Haifa Renov8 technical teamUpdated 12 August 2026Indicative ranges, not quotations

The transformation

Dated floor plate to workplace, without closing

Drag the handle to see what a fit-out actually changes: daylight reaching the floor plate, meeting space that works, and services that stop failing.

After Renovation
Before
BEFORE
AFTER HAIFA RENOV8

Construction head office · Open plan

Cat B fit-out · occupied floor

Demo pairing assembled from the Haifa archive. Replace with matched as-found and delivered frames of the same space before launch.

After Renovation
Before
BEFORE
AFTER HAIFA RENOV8

Emaar Square · Workspace

Phased handover · 11 weeks

Demo pairing assembled from the Haifa archive. Replace with matched as-found and delivered frames of the same space before launch.

After Renovation
Before
BEFORE
AFTER HAIFA RENOV8

Boardroom · Dubai tower

Meeting suite & AV integration

Demo pairing assembled from the Haifa archive. Replace with matched as-found and delivered frames of the same space before launch.

Sectors

Commercial spaces we renovate and fit out

Each sector carries a different regulator, inspection sequence and definition of "finished". We staff the project accordingly.

Workplace
Office fit-out & renovation

Office fit-out & renovation

Cat A and Cat B delivery for free-zone and mainland offices — partitions, ceilings, HVAC rebalancing, data, joinery and workplace acoustics.

  • Landlord fit-out guide compliance
  • Acoustic and meeting-room performance
  • Live-office phasing and night works
Retail & banking
Retail Showroom

Retail, showroom & branch

Mall and street-front retail built to brand standards and landlord handover criteria, with shopfront, lighting and display joinery detailed in-house.

  • Mall fit-out approvals and deposits
  • Shopfront and signage compliance
  • Overnight mall working windows
Hospitality
Restaurant & café fit-out

Restaurant & café fit-out

Kitchen extraction, grease management, food-control layouts, cold rooms and front of house — coordinated so Municipality sign-off isn't a surprise at the end.

  • Civil defence and extraction design
  • Food Control layout approval
  • Kitchen equipment coordination
Healthcare
Clinic & medical fit-out

Clinic & medical fit-out

DHA-compliant clinical layouts, infection-control finishes, medical gas provision and lead-lined imaging rooms delivered to licensing requirements.

  • DHA layout and licensing support
  • Hygienic wall and floor systems
  • Radiology shielding coordination
Industrial & leisure
Warehouse, industrial & leisure

Warehouse, industrial & leisure

Mezzanines, office pods, epoxy flooring, sports surfaces, industrial power and ventilation for Al Quoz, DIP, JAFZA and DSO facilities.

  • Mezzanine structural approval
  • Epoxy and sports flooring systems
  • Power upgrades and DEWA liaison
Amenity
Building & amenity refurbishment

Building & amenity refurbishment

Lobbies, corridors, gyms, staff lounges, pool decks and landscaped podiums for owners associations and asset managers, priced as a capital works programme.

  • Occupied-building phasing
  • Pool and landscape refurbishment
  • Asset-manager reporting formats

Delivered work

Recent commercial projects

Budget

Commercial fit-out cost in Dubai, by sector and specification

Ranges include construction, MEP, standard authority submissions and supervision. Loose furniture, IT hardware and specialist kitchen or medical equipment are priced separately.

Indicative fit-out rates · AED per sq ft · Dubai · 2026
Space type Functional Corporate Premium Typical duration
Office — Cat A 180 – 230 230 – 280 280 – 360 5 – 9 weeks
Office — Cat B 280 – 380 380 – 550 550 – 950 8 – 16 weeks
Retail & showroom 350 – 480 480 – 750 750 – 1,300 6 – 12 weeks
Restaurant & café 450 – 700 700 – 1,100 1,100 – 1,900 10 – 20 weeks
Clinic & medical 400 – 580 580 – 850 850 – 1,400 10 – 18 weeks
Warehouse & industrial 120 – 190 190 – 300 300 – 450 5 – 12 weeks

Model your fit-out budget

Including the variables that usually get missed at board-approval stage.

Space type
Leasable area
5,000 SQ FT
Specification
Project variables
Indicative project range
AED 1.15M - AED 1.40M

5,000 sq ft Cat A office at AED 230–280/sq ft, corporate specification.

Construction & MEP

AED 1.15M - AED 1.40M

Request a priced BOQ

Planning tool only. Final pricing follows a site survey and measured BOQ.

Indicative project range
AED 1.90M - AED 2.75M

5,000 sq ft Cat B office at AED 380–550/sq ft, corporate specification.

Construction & MEP

AED 1.90M - AED 2.75M

Request a priced BOQ

Planning tool only. Final pricing follows a site survey and measured BOQ.

Indicative project range
AED 2.40M - AED 3.75M

5,000 sq ft retail at AED 480–750/sq ft, corporate specification.

Construction & MEP

AED 2.40M - AED 3.75M

Request a priced BOQ

Planning tool only. Final pricing follows a site survey and measured BOQ.

Indicative project range
AED 3.50M - AED 5.50M

5,000 sq ft restaurant at AED 700–1100/sq ft, corporate specification.

Construction & MEP

AED 3.50M - AED 5.50M

Request a priced BOQ

Planning tool only. Final pricing follows a site survey and measured BOQ.

Indicative project range
AED 2.90M - AED 4.25M

5,000 sq ft clinic at AED 580–850/sq ft, corporate specification.

Construction & MEP

AED 2.90M - AED 4.25M

Request a priced BOQ

Planning tool only. Final pricing follows a site survey and measured BOQ.

Indicative project range
AED 950,000 - AED 1.50M

5,000 sq ft warehouse at AED 190–300/sq ft, corporate specification.

Construction & MEP

AED 950,000 - AED 1.50M

Request a priced BOQ

Planning tool only. Final pricing follows a site survey and measured BOQ.

Approvals & compliance

Which authority approves your fit-out

Your jurisdiction is set by the address, not by the business. We identify the route on day one so the design is drawn to the right standard from the first sketch.

Yes. Every commercial fit-out needs a landlord or building-management NOC plus a permit from the governing authority — Dubai Municipality on mainland, or a free-zone authority such as DDA, DMCC, DAFZA, DSO, JAFZA or Trakhees. Fire and life-safety drawings require civil defence review, and the space must pass staged inspections before occupation.

We submit as a registered contractor and consultant, and build the inspection dates into the construction programme rather than treating them as an afterthought.

DDA requires a registered consultant and contractor, a full drawing set including fire strategy, and a series of inspections through the build. Working hours in occupied towers are restricted, and hoarding, access and waste routes must be agreed with building management before mobilisation.

Trakhees applies its own EHS regime alongside the building code. Expect method statements, risk assessments, permits to work for hot works, and a stronger emphasis on site-safety documentation than mainland projects. Inspections are staged and non-negotiable.

Mainland fit-outs are permitted through Dubai Municipality. Food and beverage projects additionally need Food Control approval of the kitchen layout, extraction, grease interception and finishes, with an inspection before trading. Getting the kitchen layout approved before joinery fabrication is the single biggest schedule protection in an F&B project.

Most Grade A buildings issue a fit-out guide covering permitted materials, ceiling heights, sprinkler and HVAC modification rules, insurance levels and refundable deposits. It also sets your reinstatement obligation at lease end. We review it before design, so nothing drawn has to be redrawn.

How a commercial project runs

Programmed around your trading calendar

On commercial work the constraint is rarely the build. It's the lease date, the trading hours and the inspection queue.

Stage 01

Feasibility

Site survey, landlord guide review, authority route confirmed and a budget band — before you commit to the lease.

Week 0-1
Stage 02

Design & BOQ

Space planning, MEP strategy, fire strategy and a measured BOQ aligned to your capex approval format.

Week 1-5
Stage 03

Permits

Authority submission, civil defence review, landlord NOC, insurances and deposits on a live approvals log.

Week 3-8
Stage 04

Construction

Phased or night works where needed, dedicated site manager, weekly progress and cost reporting to finance.

Week 8+
Stage 05

Handover

Testing and commissioning, inspection clearance, O&M manuals, as-builts and a 12-month warranty.

Handover

Experience · Expertise · Authority · Trust

Why facilities and finance teams sign with us

Commercial clients aren't buying a mood board. They're buying a date, a number and an inspection pass.

Experience

Offices, banks, clinics, sports facilities

Delivered work includes offices in DIFC and Downtown, a bank branch fit-out, a construction group head office and indoor padel courts in Dubai Investments Park — across free-zone and mainland jurisdictions.

Expertise

MEP and fire strategy in-house

HVAC rebalancing, sprinkler modification, fire alarm interface and data infrastructure are engineered by our own team, which is where most fit-out programmes actually fail.

Authoritativeness

Registered where you're building

  • Dubai Municipality contracting licence
  • Registered with DDA, Trakhees and major free zones
  • Contractor all-risk, third-party and workmen's cover
  • Documented HSE and permit-to-work procedures
Trust

Reporting your CFO can use

  • Measured BOQ with logged, priced variations
  • Milestone payments against verified progress
  • Weekly cost and programme reporting
  • Full O&M and as-built documentation
image

Case study · Emaar Square, Downtown Dubai

A Cat B fit-out delivered around a live floor

The client took additional space on an occupied floor and could not pause operations. We hoarded the works zone, moved all demolition and heavy MEP into night windows agreed with building management, and staged the handover in two phases so the first team moved in while the second zone was still finishing.

Fire alarm and sprinkler modifications were submitted early, clearing civil defence review before the ceiling grid closed — the usual point where fit-outs stall.

0 days

Business downtime

2

Phased handovers

1st

Inspection passed first time

11 wks

Site duration

HR

Reviewed by the Haifa Renov8 technical team

Fit-out rates, approval routes and inspection sequences on this page are maintained by our commercial project managers and MEP leads, and reviewed each quarter against live project data.

Last reviewed 12 August 2026 · Office No. F-58, The Curve Building, Sheikh Zayed Road, Dubai

Where we work

Commercial districts we deliver in

Jurisdiction, working hours and access rules change by district. Tell us the address and we'll tell you the route.

FAQs

Commercial fit-out questions, answered directly

A Cat B office fit-out takes 8 to 16 weeks on site for a typical floor plate, plus 3 to 6 weeks for design and 2 to 5 weeks for permits. Cat A works finish in 5 to 9 weeks. Restaurants take longest because kitchen extraction, civil defence and food control approvals run in sequence rather than parallel.

Yes, and on occupied floors it's usually the right answer. Night and weekend works typically add 10–15% to labour cost but protect trading revenue and avoid the disruption that comes with building next to a live team. Building management approval and out-of-hours access permits are arranged as part of mobilisation.

Cat A is the landlord's baseline: raised floors, suspended ceilings, basic mechanical and electrical, and finished common areas — a lettable but unusable shell. Cat B is the occupier's fit-out: partitions, meeting rooms, joinery, branding, data, lighting design and furniture. Most tenants inherit Cat A and pay for Cat B.

Almost always the tenant. Standard Dubai leases require the space returned to its original Cat A condition unless the landlord waives it in writing. We flag the reinstatement obligation during design so you can decide whether a permanent alteration is worth the exit cost.

Yes. Power upgrade applications, civil defence submissions and Etisalat or du coordination are handled by our team as part of the approvals package, with a live log showing what has been submitted, what is pending and what has cleared.

Yes — it's our default. One contract covers design, approvals and construction, which removes the gap between what was drawn and what can be built. For clients with an appointed consultant, we also tender and deliver as a build-only contractor.

Start a project

Tell us the property. We'll come and measure it.

A senior team member visits, surveys the space and returns a scoped budget band — before any commitment.

image

What happens next

  • We call within one business day to confirm scope and access.
  • Free site visit with a project manager and designer.
  • Measured budget band within 3–5 working days.
  • Full BOQ and drawings once you're ready to proceed.

+971 50 847 9303 · info@haifagroups.com
Office F-58, The Curve Building, Sheikh Zayed Road